Some Representative Fiber OPtic Cable Projects GL Has Joined For Customer Kind Reference:
Country Name |
Project Name |
Quantity |
Project Discription |
Nigeria |
Lokoja-Okeagbe 132kV Transmission Lines |
200KM |
The overhead ground wires shall have the characteristics as stated in Schedule D. Completed with BS 183 / IEC 60888 standard. |
Switzerland |
Suomen Erillisverkot Oy,EU-hankintailmoitus Tarjouspyyntö312847 |
500KM |
The Fiber cable project it consist the 500 Kilometer OPGW and the hardwares of suspension clamps, tension clamps, vibration damper etc. |
Botswana |
Installation and Commission of 315KM ADSS Fibre Optic Cable |
315KM |
Supply, Delivery Installation and Commission of 315KM ADSS Fibre Optic Cable |
Nepal |
long Dordi -1 HEP-KIRTIAR 132kv S/C Transmission Line In Nepal |
100km |
100km long Dordi -1 HEP-KIRTIAR 132kv S/C Transmission Line In Nepal |
Malawi |
Electricity Supply Corporation of Malawi (ESCOM) Ltd |
310KM |
ADSS 310KM Supply And Delivery Of Optic Fiber Cables Equipment And Accessories Cables. |
Zimbabwe |
(CBTD) 08-19 FOR THE SUPPLY AND DELIVERY OF 24 CORE ADSS CABLE |
235KM |
235KM 24core ADSS fiber optic cable, the end user is TelOne Zimbabwe |
Costa Rica |
B-24/SM/MTY(F)-PCCSTP-B13.5 |
200KM |
24F SM G652D Dry Tube Double Sheath Steel Tape Armored Anti Rodent O.F.C,200KM in Costa Rica. |
Armenia |
ARMENIA THIRD LINE 400KV D.C. T/L |
286KM |
286KM 24F OPGW, Being the largest 500kV transmission line project for ARMENIA National Grid up to now, with the maximum bidding amount among Chinese wire manufacturers in ARMENIA wire market. |
Afghanistan |
115Kv Transmission Line |
160KM |
160KM Procurement OPGW cable for 115Kv Transmission Line |